From our creator index
- 24,032
- UGC-qualified creators indexed
- 1,706
- median followers
- 31%
- under 1,000 followers
- 47%
- in the 1k to 5k band
- 32.1%
- with a portfolio link
- 22,393 / 1,639
- Instagram / TikTok
Snapshot of 14 September 2026. Every figure counts creators that passed the app's own UGC qualification gate; the index holds no engagement or rate fields, so none are quoted. Creator listed here? Request removal: hello@ugcagent.app.
The order the work runs in, and what you open at each step
None of this is hard once the sequence is fixed. What sinks a first paid job is doing steps out of order: designing a cover still before any footage exists, or filming before anyone agreed the shot list.
- Read the brief twice and write down the gapsAsset count, runtime, aspect ratio, usage window, deadline, and who supplies the product. Send every gap back in one message before agreeing a price.
- Convert it into a numbered shot listOne line per shot, with a duration and a note on what that shot proves. Eight to twelve lines covers thirty seconds. Our script generator will draft the spoken lines when the brief leaves them open.
- Film in blocks rather than in sequenceShoot everything that shares a setup together, then move. Lock exposure and white balance, work in daylight where possible, and take every line twice.
- Assemble in a video editorCut against the waveform, trim inside words, and get the opening landing inside the first second and a half. This step never happens in a layout tool.
- Add the flat pieces once the cut is lockedCaption cards, a cover still, an end frame. Build them after the timings stop moving, otherwise you build them twice.
- Export, name, upload, then write one noteEverything into a single shared folder with a short message listing what is in it and which decision you need back.
| File | What it contains | Who uses it |
|---|---|---|
| Vertical master | The locked cut with captions and audio | Whoever posts it organically |
| Clean master | Identical cut, no text and no music | The buyer building ad variants |
| Hook variants | Alternate opening seconds, same body | Whoever runs the creative test |
| Stills | Full-resolution frames lifted from the footage | Email, listing pages, static placements |
| Selects | The unedited clips you chose, topped and tailed | An editor recutting next quarter |
Selects and originals are priced add-ons, so they belong in the folder only when the brief bought them.
The exports a brand expects, and the one nobody remembers to ask for
Assume four files as a floor: the edited vertical master at 1080 by 1920, any hook variants the brief paid for, a handful of stills, and the clean master. The clean master is the one nobody requests.
A clean master is the same cut with no burned-in captions, no text cards and no music. It lets a buyer swap an opening, translate a caption or re-time the whole thing for another placement without coming back to you. Deliver it unasked and you become the creator nobody has to manage.
Two more are worth offering free. A 4:5 crop, because feed placements get cropped anyway and whoever does it at the brand end will do it badly. And full-resolution frame grabs, since the same afternoon of filming then feeds an email header and a listing image at no extra shooting cost.
Delivery discipline is also why the workflow matters more than your following. The typical creator we hold sits at 1,706 followers, 47% cluster in the low thousands, and barely 10.8% clear ten thousand, which means the decision rests on whether the files arrive right rather than on an audience.
Keeping originals out of the edit
The originals are the only thing you cannot remake. Copy them off the phone into a dated folder, leave that folder untouched, and work from duplicates. Four folders covers it: originals, selects, edit project, delivery.
Do not route originals through a browser-based design tool on their way anywhere. Every upload and export re-encodes the picture, and two passes of that on a clip filmed in bad light is visible to anyone watching on a good screen. Correction happens once, early, in the editor.
Handing the originals over is a separate sale. Price it: the calculator's 2026 estimate for that add-on begins at $50 in the nano tier and reaches $195 at established, and those are planning numbers, not a price anyone owes you. Charge for it when asked, and keep your own copy for as long as the licence runs, because a request for a reshoot usually turns out to be a request for a recut.
Naming files so the third round of feedback still resolves
Feedback arrives as the second one but with the first ending. That sentence is only answerable if every file carries a name that says what it is. Choose a single pattern and refuse to deviate from it: brand, product, format, aspect, version. Something like northpine_bottle_30s_916_v03, with northpine_bottle_30s_916_v03_clean for the one carrying no text.
Numbers only go up. Two digits so a folder sorts properly, and no file called final. Final has cost more people more work than any codec ever has. When a version is signed off, append approved to that name instead of inventing a new one.
Keep a plain text note in the folder with one line per version: what changed and who asked for it. Three rounds deep, that note is how you answer a request to go back to how it was without reopening four project files. It is also the document that shows a brand when the fourth round of changes sits outside what they bought.
Questions
How long should a first job take end to end?
Budget a full day for one thirty second video, split across two: filming on one, cutting and exporting on the other. It compresses to three or four hours once your folder structure, shot-list format and naming pattern stop being decisions. Quote against the slow version until you have finished five of them.
Should I send the project file to the brand?
Not unless they bought it. A project file is your working method rather than a deliverable, and it will not open on their machine without the same software and the same footage sitting in the same place. Offer another round of changes instead.
What happens when changes arrive after approval?
You make them, and you say what they cost. One small fix after sign-off is goodwill and takes ten minutes. A new opening, a restructured cut or another filming session is a further deliverable, so point at the agreed revision count and quote the extra as its own line.